Category: | A general photo.: Other (infrastructure-related) |
Tags: | a1307, crossing, toucan |
Date time: | 10.40am, Sunday 27th September, 2020 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | nigeld |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
New Toucan crossing to connect the cycleway from Cambridge with the path that leads through the grounds of the Babraham Research Campus to Babraham.
See also #152127
Comments reflect the views of the original submitter only.