Donate using PayPal

All photos in & around Bodmin

Showing items 1 to 100 from total of 2,801 items. Ordered by photo # descending.

Photo # Icon Photo Caption Categorisation
186369Photo #186369All the bikes in Penzance station have been tagged for removal.Cycle parking:
Event
cycleparking
186368Photo #186368Shared-use path unavailable on NCN route 3 in HayleRoadworks:
Event
roadworks
186367Photo #186367Pretty pathetic cycle provision at Tesco, Carbis Bay (also 3 similar stands in the distance)Cycle parking:
Problem
cycleparking
186285Photo #186285Just another NHS clinic with a car park but no cycle stands.Road environment:
Problem
road
186284Photo #186284The finger sign has gone, and it's not shown on the online maps, but there should be a bridleway here.Track:
Infrastructure
track
186283Photo #186283The finger sign has gone, and it's not shown on the online maps, but there should be a bridleway here.Track:
Infrastructure
track
186282Photo #186282Cut-through past Trewartha care home, Carbis Bay - not on the online maps.Track:
Infrastructure
track
186281Photo #186281Cut-through to primary school, Carbis Bay - not on the online maps.Track:
Infrastructure
track
186280Photo #186280Cut-through to primary school, Carbis Bay - not on the online maps.Track:
Infrastructure
track
186279Photo #186279Public footpath west from Carbis Bay station - shown as a cycleway on OpenCycleMap. Hmmm.Track:
Infrastructure
track
186278Photo #186278Another bridleway towards the Bakers Pit Nature Reserve - not on the online maps, and not much use for cyclists.Track:
Infrastructure
track
186264Photo #186264Bridleway to Bakers Pit Nature ReserveTrack:
Infrastructure
track
186263Photo #186263Bridleway above PenzanceTrack:
Infrastructure
track
186262Photo #186262Junction of bridleways above PenzanceTrack:
Infrastructure
track
186257Photo #186257August 2022 - Liskeard Town Council is proposing to limit Charter Way (the A390) to 30mph and to add a segregated cycle and footpath, plus a two-way cycle path on Plymouth Road and other changes including more 20mph zones.Cycleway:
Infrastructure
cycleways
183994Photo #183994Barriers on new link from Helston Business ParkObstruction:
Infrastructure
obstructions
183993Photo #183993Barriers on new link to Helston Business ParkTrack:
Infrastructure
track
183992Photo #183992Start of new link from Helston Business ParkTrack:
Infrastructure
track
183991Photo #183991Modal filter - designed for pedestrians rather than cycles - on the edge of HelstonCycleway:
Infrastructure
cycleways
183990Photo #183990End of Cycle Route sign in a future developmentGeneral sign/notice:
Infrastructure
signs
183989Photo #183989Start of shared-use route around the Falmouth Road roundabout, HelstonCycleway:
Infrastructure
cycleways
183988Photo #183988Path with steps to the B3297, HelstonTrack:
Infrastructure
track
183987Photo #183987Cut-through in the Tremenheere estate, HelstonTrack:
Infrastructure
track
183986Photo #183986Cut-through in the Tremenheere estate, HelstonTrack:
Infrastructure
track
183985Photo #183985Cut-through in the Tremenheere estate, HelstonTrack:
Infrastructure
track
183984Photo #183984Cut-through in the Tremenheere estate, HelstonTrack:
Infrastructure
track
183983Photo #183983Cut-through in the Tremenheere estate, HelstonTrack:
Infrastructure
track
183982Photo #183982Cut-through in the Tremenheere estate, HelstonCycleway:
Infrastructure
cycleways
183981Photo #183981Paved footpath through the Tremenheere estate, HelstonTrack:
Infrastructure
track
183980Photo #183980Paved footpath through the Tremenheere estate, Helston, with other paths starting to left and rightTrack:
Infrastructure
track
183979Photo #183979Paved footpath through the Tremenheere estate, HelstonTrack:
Infrastructure
track
183978Photo #183978Junction on 'cycleway' to Forth Gwedhen, HelstonCycleway:
Infrastructure
cycleways
183977Photo #183977Barriers on 'cycleway' to Forth Gwedhen, HelstonObstruction:
Infrastructure
obstructions
183976Photo #183976Gate to Tremenheere Avenue and 'cycleway' right to Forth Gwedhen, HelstonTrack:
Infrastructure
track
183975Photo #183975End of the 'cycleway' (according to OpenCycleMap) through the Tremenheere estate, HelstonTrack:
Infrastructure
track
183974Photo #183974At least there's been some strimming on the 'cycleway' (according to OpenCycleMap) through the Tremenheere estate, HelstonTrack:
Infrastructure
track
183973Photo #183973Link from the 'cycleway' (according to OpenCycleMap) through the Tremenheere estate, HelstonTrack:
Infrastructure
track
183972Photo #183972Link from the 'cycleway' (according to OpenCycleMap) through the Tremenheere estate, HelstonTrack:
Infrastructure
track
183971Photo #183971The 'cycleway' (according to OpenCycleMap) through the Tremenheere estate, HelstonTrack:
Infrastructure
track
183970Photo #183970The 'cycleway' (according to OpenCycleMap) through the Tremenheere estate, HelstonTrack:
Infrastructure
track
183969Photo #183969Start of the 'cycleway' (according to OpenCycleMap) through the Tremenheere estate, HelstonTrack:
Infrastructure
track
183968Photo #183968Puddles on the link from the so-called cycleway through the Tremenheere estate, HelstonTrack:
Infrastructure
track
183967Photo #183967To the left, Trenethick Barton (listed Grade I, but no-one knows it's here), to the right the link to the so-called cycleway through the Tremenheere estate, HelstonTrack:
Infrastructure
track
183966Photo #183966Start of link to Tremenheere Avenue, HelstonTrack:
Infrastructure
track
183965Photo #183965Start of link to the so-called cycleway through the Tremenheere estate, HelstonTrack:
Infrastructure
track
183964Photo #183964Cut-through to Seneschall Park, HelstonTrack:
Infrastructure
track
183963Photo #183963Barriers on cut-through to Trenethick Park, HelstonObstruction:
Infrastructure
obstructions
183962Photo #183962Cycleway or shared-use route needed hereRoad environment:
Problem
road
183961Photo #183961Dropped kerb and barriers on the cut-through to Gwealdues Green, HelstonObstruction:
Infrastructure
obstructions
183960Photo #183960Barriers on Winns Row, HelstonObstruction:
Infrastructure
obstructions
183959Photo #183959Footpath to Budock WaterTrack:
Infrastructure
track
183958Photo #183958Cycleway from Budock Water to Falmouth (and footpath through the field to the left)Cycleway:
Infrastructure
cycleways
183957Photo #183957Cycleway to Budock WaterCycleway:
Infrastructure
cycleways
183956Photo #183956Cycleway to Budock WaterCycleway:
Infrastructure
cycleways
183955Photo #183955Link off the cycle route to Budock WaterCycleway:
Infrastructure
cycleways
183954Photo #183954Link off the cycle route to Budock WaterCycleway:
Infrastructure
cycleways
183953Photo #183953Blocked permeabilityObstruction:
Problem
obstructions
183952Photo #183952Cycle route from Budock Water towards FalmouthCycleway:
Infrastructure
cycleways
183951Photo #183951Cycle route to Budock WaterCycleway:
Infrastructure
cycleways
183950Photo #183950Start of cycle route to Budock WaterCycleway:
Infrastructure
cycleways
183949Photo #183949The short shared-use route starts hereCycleway:
Infrastructure
cycleways
183948Photo #183948End of shared-use routeCycleway:
Infrastructure
cycleways
183947Photo #183947Shared-use route supposedly ending at the crossing - but in fact it continues to Church WalkGeneral sign/notice:
Problem
signs
183946Photo #183946Falmouth CyclesBike shop:
Infrastructure
bikeshops
183945Photo #183945Future link to the Gwealdues estate, HelstonObstruction:
Infrastructure
obstructions
183944Photo #183944Barriers on link from the B3297 to new housing, HelstonObstruction:
Problem
obstructions
183943Photo #183943End of shared-use route on the former course of the Helston-Falmouth road.Cycleway:
Infrastructure
cycleways
183942Photo #183942Decent link from new housing to the B3297, HelstonCycleway:
Infrastructure
cycleways
183155Photo #183155At Roskilly's - the best ice cream in CornwallDestination:
Event
destinations
182782Photo #182782Aldi, Camborne - spaces for Click & Collect, Parents & Children, etc, but no cycle stands - still, it is right in the town centre.Cycle parking:
Problem
cycleparking
182742Photo #182742Sign for cyclists on NCN route 3 to turn right at the toucan crossing ahead.Route sign:
Infrastructure
routesigns
182741Photo #182741NCN route 3 continues ahead, cyclists turning right to Penzance station are supposed to dismount to cross a car park.General sign/notice:
Problem
signs
182740Photo #182740Missing link between the shared-use path (NCN route 3) from Marazion to Penzance and teh dead-end path past the Coastwatch station.Obstruction:
Infrastructure
obstructions
182739Photo #182739Shared-use path (NCN route 3) from Penzance station towards Marazion.Cycleway:
Infrastructure
cycleways
182738Photo #182738Start of resurfaced shared-use path (NCN route 3) from Penzance to MarazionCycleway:
Infrastructure
cycleways
182737Photo #182737Resurfaced shared-use path (NCN route 3) at the Eastern Green footbridgeCycleway:
Infrastructure
cycleways
182736Photo #182736A proper route for NCN route 3 has been created through the Long Rock car parkCycleway:
Infrastructure
cycleways
182735Photo #182735A proper route for NCN route 3 has been created through the Long Rock car parkCycleway:
Infrastructure
cycleways
182734Photo #182734The shared-use coast path (NCN route 3) from Station Lane car park, Marazion, to Penzance has been resurfaced - at the Long Rock level crossing and car park.Cycleway:
Infrastructure
cycleways
182733Photo #182733The shared-use coast path (NCN route 3) from Station Lane car park, Marazion, to Penzance has been resurfaced.Cycleway:
Infrastructure
cycleways
182732Photo #182732The shared-use coast path (NCN route 3) from Station Lane car park, Marazion, to Penzance has been resurfaced.Cycleway:
Infrastructure
cycleways
182731Photo #182731The shared-use coast path (NCN route 3) from Penzance to Station Lane car park, Marazion, has been resurfaced.Cycleway:
Infrastructure
cycleways
182730Photo #182730The shared-use coast path (NCN route 3) from Station Lane car park, Marazion, to Penzance has been resurfaced.Cycleway:
Infrastructure
cycleways
182729Photo #182729A proper route for NCN route 3 has been created through the Station Lane car parkCycleway:
Infrastructure
cycleways
182727Photo #182727New cycle parking at the start of the shared-use section of NCN route 3 to Marazion.Cycle parking:
Infrastructure
cycleparking
182726Photo #182726Shared-use section of NCN route 3 towards MarazionCycleway:
Infrastructure
cycleways
182725Photo #182725Footpath towards Marazion - NCN route 3 uses the road and turns left in the middle distanceRoad environment:
Infrastructure
road
182724Photo #182724Coastal footpath, Marazion - cyclists have to use the road until it reaches NCN route 3Track:
Infrastructure
track
182723Photo #182723Coastal footpath, Marazion - cyclists have to use the road until it reaches NCN route 3Track:
Infrastructure
track
182722Photo #182722Coastal footpath, Marazion - cyclists have to use the road until it reaches NCN route 3Track:
Infrastructure
track
182721Photo #182721Coastal footpath through a car park, Marazion - cyclists have to use the road until it reaches NCN route 3Track:
Infrastructure
track
182720Photo #182720Coastal footpath, Marazion - cyclists have to use the road until it reaches NCN route 3Track:
Infrastructure
track
182697Photo #182697Side road for car storage and access to the coast path to Penzance - but not as yet the cycle route.Road environment:
Infrastructure
road
182688Photo #182688Short bridleway from Porthgwarra to the Coastwatch stationRoute sign:
Infrastructure
routesigns
182687Photo #182687Short bridleway up from Nanjizal beachRoute sign:
Infrastructure
routesigns
182686Photo #182686Short bridleway up from Nanjizal beachTrack:
Infrastructure
track
182676Photo #182676Love Lane - a bridleway out of Fowey, a bit narrow and slippery in places.Track:
Infrastructure
track
182670Photo #182670Cycle parking in the centre of St IvesCycle parking:
Infrastructure
cycleparking
182669Photo #182669Three streets in St Ives that are miraculously free of parked cars.Road environment:
Infrastructure
road
182668Photo #182668A nice little cut-through in St Ives - except for the parked cars.Obstruction:
Infrastructure
obstructions

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://bodmin.cyclestreets.net/photos/all/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.